Mounting and Manufacturing Capabilities
Manufacturing Capacity
Digital management system with full-process quality traceability
|
Project |
Conventional process |
Non-conventional process |
Note |
||
|
SMT process |
PCB |
Minimum size |
L≥50mm W≥50mm |
L < 50 mm W < 50 mm |
The minimum pin spacing for FPC-type PCBs is ≥0.4mm. |
|
Maximum size |
L ≤ 450 mm W ≤ 400 mm |
L ≤ 800 mm W ≤ 450 mm |
|||
|
Thickness (T) |
0.5 mm ≤ T ≤ 3 mm |
T < 0.5 mm T > 3 mm |
|||
|
Device size |
Smallest package |
0201 (0.6mm*0.3mm) |
01005 (0.3mm * 0.2mm) |
The height of double-sided process devices ≤ 25 mm. |
|
|
Maximum size |
SMD ≤ 200mm × 125mm |
SMD > 200mm * 125mm |
|||
|
Device thickness |
T ≤ 15 mm |
T > 15 mm |
|||
|
QFP, SOP, SOJ, etc. |
Minimum PIN spacing |
0.35mm |
0.3 mm ≤ Pitch < 0.35 mm |
||
|
CSP, BGA |
Minimum ball spacing |
0.35mm |
0.3 mm ≤ Pitch < 0.4 mm |
||
|
DIP process (Reflow Soldering) |
PCB size |
Minimum size |
L≥50mm W≥50mm |
L < 50 mm |
BOT surface component <9mm The distance between the pin of the plug-in component and the SMT part on the BOT side shall be greater than the thickness of the SMT part plus 1.0 mm. |
|
Maximum size |
L ≤ 500 mm W ≤ 400 mm |
L < 800 mm W ≤ 400 mm |
|||
|
Thinnest dimension |
T ≥ 0.5 mm |
T < 0.5 mm |
|||
|
Maximum thickness |
T ≤ 5 mm |
T > 5 mm |
|||
|
Three-proof coating process |
Process parameters |
Temperature resistance range |
-40℃ ≤ T ≤ 120℃ |
-50℃ ≤ T ≤ 150℃ |
The three-proof unconventional process involves manual brushing. |
|
Coating thickness |
25 µm ≤ T ≤ 50 µm |
T > 50 µm |
|||
|
Flying needle test Process |
Device height |
Upper side |
H ≤ 60 mm |
H > 60 mm |
Product Static Circuit Detection |
|
Lower side |
H ≤ 120 mm |
H > 120 mm |
|||
|
PCB thickness |
Thickness |
T ≤ 5 mm |
T > 5 mm |
||
Production equipment
Production Equipment
High-precision, cutting-edge manufacturing equipment, both domestically and internationally; small-pitch 0.35 pitch BGA/QFN.
Board separator
Selective Coating Machine
External Spray Nitrogen Wave Soldering
GT++ Fully Automatic Solder Paste Printer
3D SPI solder paste inspection machine
Panasonic NPM Pick-and-Place Machine
Import from domestic and international sources
High-precision and advanced
Manufacturing equipment
Small pitch
0.35 pitch
BGA/QFN
Digital Management System
Digital Management System
Quality assurance
Quality Assurance
Twelve-step testing process
Twelve Inspection Processes
IQC incoming material inspection
IPQC Line Inspection
Steel mesh tension detection
FAI First Article Inspection
X-ray inspection
3D-AOI Optical Inspection (SMT)
DIP Plug-in AOI Optical Inspection
ICT Testing (Optional)
FCT Functional Testing
FQC manual inspection
OQC Shipment Inspection
3D-SPI solder paste inspection
Delivery Management
Delivery Management
24/7 rapid response, fast delivery.
Technical support
Order Service
Production Operations
Home delivery
12H
500-1000 small to medium quantities
24H
100-500 small batches
48H
500-1000 small to medium quantities
72H
1K-5K batch
48H
>5K large batch
Delivery Management
Pull-based planning—“Push and pull” to build a “highway” from order placement to product shipment.
Customer-centric
快速服务
The CFT multi-functional team responds to customer needs around the clock; it also holds regular production-and-sales coordination meetings to collaboratively address challenges encountered in market sales.
前置治工具制作计划
The CFT multi-functional team responds to customer needs around the clock; it also holds regular production-and-sales coordination meetings to collaboratively address challenges encountered in market sales.
物料烘烤纳入生产计划
The material baking time is linked to the warehouse material issuance module, enabling proactive material issuance based on planned demand and reducing the turnaround time for handling online anomalies.
日生产“六步法”
Daily Plan: The production plan is detailed down to the smallest unit, with clearly defined task objectives. Daily Improvement: Focus on addressing bottlenecks and resolving production abnormalities. Daily Material Preparation: Conduct pre-production checks and preparations based on the plan. Daily Inspection: Perform frequent inspections every 2 hours. Daily Coordination: Hold production coordination meetings and order-specific meetings. Daily Assessment: Evaluate the achievement of the daily plan and performance metrics.
缩短物料齐套周期
Establish a material control position, proactively communicate with customers in a timely manner about any abnormalities in customer-supplied materials, provide on-site support to customers regarding order preparation and damage prevention standards as well as material loss management, and reduce cycle times associated with intermediate sales handoffs.